Collection of damaged photovoltaic panels – various locations in Poland
We recently received an order to collect photovoltaic panels from several locations in Poland. Since we had agreed with the principal that the acceptance was on our side, we had to coordinate it carefully. When executing an order, we always focus on professionalism and meticulousness, which is key to ensuring the safe transportation and disposal of photovoltaic panels.
In total, we had more than 250 photovoltaic panels to collect from various locations in Poland. The total weight of these panels was about 5.5 tons. Consequently, transporting these modules involved scheduling several trips.
The damage was manifold. Therefore, we could not stack all the solar modules on pallets. We had to load some of them one by one due to the condition they were in.
Therefore, before receiving the damaged panels, we received information about what kind of damage they were. With this information, we were able to carefully plan the route for collecting these modules.
Collection of damaged photovoltaic panels
The damage was primarily to:
- Microfractures. Often invisible to the naked eye, but potentially affecting panel performance.
- Mechanical Damage. Windstorm, damage in transit or installation.
- Delamination, burned-out MC4 connectors.
Locations
In the case of Tri-City, our team, in addition to the reception itself, also had to ensure the dismantling of the panels and structure. This is also where the largest batch of destroyed modules came from. On Silesia, where photovoltaics are playing an increasingly important role, we picked up panels from an industrial zone. There we had the cargo prepared for transport, arranged on pallets.While in Warsaw i Lodz the broken panels we took for recycling came from photovoltaic farms, destroyed during installation.
Among the panels we received were modules:
- JinKo
- Jasolar
- Astronergy
- LG
- Trina Solar
- Canadian
It took us 4 days to complete the entire order. It included coordinating the work of our teams. An important element was the cooperation between the warehouse and the drivers of the cars bringing in the modules.
Are you planning to build your photovoltaic farm or looking for an O&M service company?
Do you want to purchase a photovoltaic or wind farm project and need an efficient and professional audit / due diligence?
are you looking for a photovoltaic panel recycler or cleaning company for photovoltaic plants and farms?
When you are ready to act,
then so are we!