Masz pytania? Zadzwoń! +48 797 897 895

Masz pytania? Zadzwoń!

Lighthief

Conducting due diligence on solar projects

Conducting due diligence on solar projects

When conducting due diligence for a solar farm project in Poland, several key stages must be followed. It is important to ensure a comprehensive assessment of the project’s feasibility, risks, and opportunities.

Here is an overview of the typical stages involved:

Initial Assessment

This stage involves a preliminary evaluation of the project’s potential, including an analysis of the solar resource in the proposed location, grid connection availability, land suitability, and any initial regulatory or permitting requirements. It helps to determine whether the project is worth pursuing further.

Legal and Regulatory Review

This stage thoroughly examines the legal and regulatory framework applicable to the solar farm project in Poland. It includes a review of land use regulations, environmental impact assessments, permitting requirements, grid connection procedures, and any other relevant licenses or approvals needed to develop and operate the solar farm. Any legal risks or challenges are identified during this phase.

Technical Assessment

This stage focuses on evaluating the technical aspects of the solar farm project. It includes an assessment of the solar resource potential, analyzing the site’s topography and soil conditions, reviewing the proposed design and engineering plans, evaluating of the chosen photovoltaic technology and equipment, and estimating the expected energy generation capacity. This analysis helps determine the project’s technical feasibility and identifies potential risks or optimization opportunities. Conducting due diligence on solar projects.

Financial and Economic Analysis

In this stage, a comprehensive financial analysis is conducted to assess the economic viability and profitability of the solar farm project. It involves reviewing the project’s capital and operating costs. Estimating the revenue potential from energy sales or government incentives, analyzing the financing options and potential returns on investment. Also, conducting sensitivity analysis to assess the project’s resilience to market fluctuations.

Environmental and Social Impact Assessment. Conducting due diligence on solar projects

The environmental and social impact assessment stage evaluates the solar farm project’s potential environmental and social effects. It includes assessing the impact on local ecosystems, wildlife, and biodiversity. Evaluating any potential land use conflicts or displacement of communities and analyzing any social or cultural implications. Mitigation measures and compliance with sustainability standards are considered to ensure responsible project development.

Contractual and Commercial Review

This stage involves a detailed examination of the contractual and commercial aspects related to the solar farm project. It includes reviewing agreements with suppliers, contractors, and off-takers. Also, analyzing power purchase agreements (PPAs), assessing insurance coverage, and evaluating interconnection agreements. Also, understanding any relevant tax incentives or subsidies available in Poland. This stage helps identify any contractual risks and ensures that the project’s commercial aspects are adequately addressed. Conducting due diligence on solar projects.

Due Diligence Report

Finally, all the findings from the previous stages are compiled into a comprehensive due diligence report. This report provides a detailed assessment of the project’s strengths, weaknesses, opportunities, and risks. ”DD” serves as a crucial decision-making tool for project developers, investors, and stakeholders. It helps them make informed choices regarding the development and financing of the solar farm project.

It is important to note that the specific stages and their order may vary depending on the project’s size, complexity, and the requirements of relevant stakeholders. Professional expertise from legal, technical, financial, and environmental consultants is often sought to conduct a thorough due diligence process.

If you are interested in recycling Your solar modules or investing in solar farms in Poland, don’t hesitate to get in touch with us at +48 797 897 895 or biuro@lighthief.com

Read about solar asset management in Poland.

Also read about Solar Investments in Poland.

Read about Poland’s solar farm’s industry.

Also about Chinese solar investors in Poland.

Read about O&M services on solar farms.

Dodaj komentarz

+48 797 897 895